Monthly Archives: March 2018

Xing Yuan New Town Forest Gate Weir Construction

The foundation for the Forest Gate Weir has been constructed. This weir spans 34 meters in length was design to convey base and flood flows (5 cubic meters). This is one of 55 individual water structures that GEO designed with Terrain Studios for the 26 square kilometer Xing Yuan New Town project in the City of Hanzhong, China. Stay tuned for updates in the reaming 54 structures!!!!

GEO’s babies are soon to fly the coop

Two Anna’s hummingbird babies hatched about 15 days ago and are growing at exponential rates. The two of them barely fit in the nest. It will be a sad day to see them leave but we are hopeful to see mom next year, same time, same tree and start a new family. Happy spring to all!